Utility Dive•about 1 month ago
Energy Dome, Salt River Project to build 19-MW CO2 battery system
Key Takeaway
This project marks a significant utility-scale adoption of a novel CO2 battery technology, diversifying long-duration energy storage options for grid resilience and renewable integration.
AI Summary
- •Salt River Project (SRP) and Energy Dome are developing a 19-MW / 190-MWh CO2 battery storage system, projected to be operational by 2029.
- •This long-duration storage solution is designed to power approximately 4,275 homes for 10 hours, enhancing grid reliability and supporting renewable energy integration.
- •The project signifies a major utility-scale deployment of a novel, non-lithium-ion battery technology, offering diversification in energy storage options for developers and large power consumers.
Topics
emissionsoemstorage