Back to News
Utility Diveabout 1 month ago

Energy Dome, Salt River Project to build 19-MW CO2 battery system

Key Takeaway

This project marks a significant utility-scale adoption of a novel CO2 battery technology, diversifying long-duration energy storage options for grid resilience and renewable integration.

AI Summary

  • Salt River Project (SRP) and Energy Dome are developing a 19-MW / 190-MWh CO2 battery storage system, projected to be operational by 2029.
  • This long-duration storage solution is designed to power approximately 4,275 homes for 10 hours, enhancing grid reliability and supporting renewable energy integration.
  • The project signifies a major utility-scale deployment of a novel, non-lithium-ion battery technology, offering diversification in energy storage options for developers and large power consumers.

Topics

emissionsoemstorage